Use photographs to clarify an installation punch list
A well-chosen photograph can explain where an unfinished item belongs.
Ideas for the work ahead
Clear guidance for the people planning, deploying, and supporting healthcare technology.
The insight library
102 practical guides
Browse practical guidance by date, topic, or the question you are working through.
102 guides
A well-chosen photograph can explain where an unfinished item belongs.
A room plan may show only the equipment being installed now, while the department is already considering another workstation or device.
A department may call, email and submit a ticket about the same equipment issue because it is unsure whether anyone received the request.
A report labeled “equipment downtime” may combine several different situations: an unavailable device, a device waiting for an appointment or an open ticket after work is complete.
The equipment price is only one part of a technology project discussion.
A scheduled maintenance visit can reveal work outside the original scope.
A support request may need more than one specialist, but the requester should not have to coordinate the transfer.
A planned technology interruption needs a communication plan as well as a technical plan.
A workstation location can look reasonable on a floor plan and still be awkward in the finished room.
A room can receive new equipment while its old asset label stays on a spreadsheet.
A wireless walkthrough is more productive when it starts with the intended devices and work areas.
A temporary configuration may be approved to support a specific implementation stage.